Completed Projects
Projects
Projects we gave completed and our clinets are satisfied with our performance. We hope they will work with us again.
Construction
Civil Site
Al-ula School renovation project.
Construction
Master Gas Pipeline Corridors
It is a gas pipeline project. Site is located near Madina.
We are working with Alfanar in this project.
Construction
Civil Site
Construction of residential two floor building.
- Location: Madina
- Client: Hamdan Aljahni
- Task: Full Finished Building
construction
Civil Site
It is civil work site. Site is located in Medina City.
Project is form FARIS ALHILALI.
Fence
Civil Work
It is civil work site. Site is located in SWCC Jeddah City.
Project was with Aljezeria.
- Put Fence wall of 1025 km.
construction
Civil Work
It is civil work site. Site is located in Alhinkiya City. It is Two floor building.
Project is of Civil work
- Build structure of building
construction
Civil Work
It is civil work site. Site is located in Medina City. It is four floor building.
Project is form Marwan ALHILALI.
- Build structure of building
Electrical
Electrical Work
Yanbu Street Lights changing
- Electrical Work
Construction
Civil Work
We did all civil work on this site. Site is located in Madina. It was personal contract from FAISAL ALHILALI.
- Build structure of building
Oil and Gas
LUBEREF
Saudi Aramco Base Oil Company (Luberef) is one of the world’s leading supplier of High Quality Base Oil to all major oil companies operating in the kingdom and for other international oil companies in different regions such as GCC countries, Middle East and East Africa.
We worked for the expansion of Luberef Yanbu refinery.
- Hydrocracker Unit
- ISO De-Waxing Unit
- Hydrogen and Hydrogen Recovery Unit
- Sulphur Recovery Unit
- Gas Treatment Unit.
Oil and Gas
SAYR
Saudi Aramco Yanbu Refinery (SAYR) project was Metering Skid in yanbu.
We worked as a subcontractor under the Sulzer umbrella for the expansion of SAYR base oil expansion project.
- Installation of Metering skid
- Installation of PLC and HMI Panels in CCR
- Installation of cable trays/conduits
- Instrument & power cables laying
- Termination and testing of cables
- Instruments installation
- Loop testing
Oil and Gas
SAYR
In Saudi Aramco Yanbu Refinery (SAYR) we worked for up-gradation of BERTH # 94 in SAUDI ARAMCO JETTY AND NAPHTHA PUMPS.
We worked as a subcontractor under the Sulzer umbrella for the upgradation of SAYR project.
- Installation of Motors
- Installation of ESD and DCS Panels in CCR
- Installation of cable trays/conduits
- Instrument & power cables laying
- Termination and testing of cables
- Instruments installation
- Loop Testing
Construction
PATCHI
We renovate PATCHI’s new branches in Riyadh, Khobar and Dammam as per PATCHI’s Standard.
We worked as a subcontractor under the umbrella of for PATCHI’s new branch.
- Renovation of PATCHI's branch as per Standard
Construction
SIGNATURE
We build new shops of SIGNATURE in Sharura and Abeeda as per SIGNATURE’s Standard.
We worked as a subcontractor under the umbrella of for SIGNATURE’s new shops.
- Renovation of SIGNATURE's branch as per Standard
Tower
Sulzer
Sulzer begun its operations Winterthur in 1834, they have been a transformative industrial force. They are pioneers and have been at the forefront of segments as diverse as diesel engines, trains and medical prosthetics.
We worked as a subcontractor under the Sulzer umbrella for the expansion of Luberef-II base oil expansion project.
- New sulphur treatment complex
- Hydro finishing unit
- Hydrocracker
Foundary
AL-HILALI FOUNDARIES
Al Hilali Foundries is a Machinery company located in Al Hilali Foundries Building, Medina, Saudi Arabia.
Services we offered to Alhilali Foundry are:
- Working Plans
- Labor supply
- Workforce Trainings Sessions
Oil and Gas
SINOPEC
Sinopec International Petroleum Service Corporation (SINOPEC SERVICE) is a fully owned subsidiary of the SINOPEC Group dedicated to provide international petroleum services to all major oil and gas operators.
We worked as a subcontractor under the SINOPEC umbrella for PETRO RABIGH.
- Project RABIGH 2 CP1/CP2 PROJECT